Design & Build of New Warehouse case study

Project Information

Location: Thetford, Norfolk
Contractor: Munnings Construction
Client: Hughes Electrical
Product used: K-FORM uPVC Screed Rail
Approximate Value: £1,500,000

Project Background

This project involved the construction of a new warehouse to facilitate the growth of a national electrical supplier. Initial slab design proposed a typical concrete slab at 2500 m sq utilising various joint details which upon planning of the concrete pour sequencing, proved extremely unpractical and timely.

Outcome

Using K-FORM uPVC Screed Rail reduced the amount of pours from 6 to 3 which subsequently shortened the programme duration and saved costs generated by pump visits and additional shuttering.